Menu

This is one of our recent projects that involved the construction of a reinforced concrete slab to support a 30 tonne factory boiler system.  The project was for GlaxoSmithKline (GSK) and we was subcontracted by the DES group. 

Do you have a similar project that requires a specialist ground works team?

If you have a project that requires the installation of a steel reinforced foundation, please get in touch by calling us on 01564 651400