Tesco,
Coventry
Recent concreting job carried out at Tesco Coventry for a new UFC slab.
The slab was 900m2 x 250mm thick consisting of form work, metal reinforcement with a power float to finish.
![](https://mjcolesconstruction.co.uk/wp-content/uploads/2023/08/tesco-coventry-02-1024x683.jpg)
![](https://mjcolesconstruction.co.uk/wp-content/uploads/2023/08/tesco-coventry-06-1024x683.jpg)
![](https://mjcolesconstruction.co.uk/wp-content/uploads/2023/08/tesco-coventry-05-1024x683.jpg)
![](https://mjcolesconstruction.co.uk/wp-content/uploads/2023/08/tesco-coventry-04-1024x683.jpg)
![](https://mjcolesconstruction.co.uk/wp-content/uploads/2023/08/tesco-coventry-03-683x1024.jpg)
MJC delivered this project to programme and within the two-week deadline.